List of advertisements: 1
Sale of an hydropower project.
Access to this sale will be restricted as of the beginning of March
South East (FR)
250 kW
Sale of an ready-to-build hydropower project of 250 kW under prefectural authorisation for a maximum gross power of 283 kW and located in the Ardèche department.
The gross head is of 4.45 m for a derivated flow of 6.48 m3/s.
Forecast average production of 742 MWh for an turnover between 105 ans 115 k€ under EDF H16 OA contract.
The sale includes a dam, the property and the authorisations (water right, building permit).
Advertisement n°
00885
00885
Show more