Sale of 2 hydropower plants, each held by a separate company, located in the Jura with a total capacity of 1.2 MW. The plants benefit from grandfathered water rights (fondé en titre). Average annual output of 5.45 GWh for a total average turnover of approximately 555 k€. EDF H07 contracts with all of the required investment already made. The plants are located very close to each other. Freehold ownership.

Sale of a company owning a 400 kW hydropower plant located in the Aude. The installation holds a prefectoral authorisation until 2026 for a head of approximately 5 m and a flow of 12 m3/s. EDF H07 contract until 2031. Freehold ownership. Average annual output of around 1.8 GWh for an average turnover of approximately 200 k€.

Project Canodor: sale of a portfolio of 19 plants and 4 hydropower projects with a total capacity of 83 MW. Total output of 315 GWh/year

Sale of a 2,600 kW hydropower plant, operating under a prefectoral authorisation, located in Isère. The plant, fully refurbished in 2016, has a head of 305.8 m and a diverted flow of 1.1 m3/s. Average annual output of 10.9 GWh for an average forecast turnover of 795 k€ on the open market. EDF H07 contract and sale on the open market. This plant was part of Project Canodor.

Sale of a 2,600 kW hydropower plant, operating under a prefectoral authorisation, located in Isère. The plant has a head of approximately 308 m and a diverted flow of 1.1 m3/s. Average annual output of 10.1 GWh for an average turnover of close to 770 k€. EDF H07 contract and sale on the open market. This plant was part of Project Canodor.

Sale of a 2,400 kW hydropower plant, operating under a concession, located in Isère. The plant has a head of 835 m and a diverted flow of 0.40 m3/s. Average annual output of 4.2 GWh for an average forecast turnover of 397 k€. EDF H07 contract and sale on the open market. This plant was part of Project Canodor.

Sale of a 1,600 kW hydropower plant, operating under a concession, located in Isère. The plant has a head of approximately 323.4 m and a diverted flow of 0.5 m3/s. Average annual output of 4.84 GWh for an average forecast turnover of 396 k€. EDF H07 contract. This plant was part of Project Canodor.

Sale of a 1,700 kW hydropower plant, operating under a concession, located in Isère. The plant has a head of approximately 140 m and a diverted flow of 4.2 m3/s. Average annual output of 15.1 GWh for an average forecast turnover of 1,142 k€. EDF H07 contract and sale on the open market. This plant was part of Project Canodor.

Sale of a 2,500 kW hydropower plant, operating under a prefectoral authorisation, located in Isère. The plant has a head of 89.7 m. Average annual output of 14.6 GWh for an average forecast turnover of close to 1,237 k€. EDF H07 contract and sale on the open market. This plant was part of Project Canodor.

Sale of a company owning a 1,900 kW hydropower plant, operating under a prefectoral authorisation, located in Savoie. The plant has a head of 228 m and a diverted flow of 0.85 m3/s. Average annual output of 7.24 GWh for an average turnover of 581 k€. EDF H07 contract. This plant was part of Project Canodor.

Sale of a company owning a 2,095 kW hydropower plant with a prefectoral authorisation, located in the Hautes-Alpes. The plant has a head of 610 m and a diverted flow of 0.35 m3/s. Average annual output of 5 GWh for average revenue of €375k. EDF H07 contract. This plant was part of Project Canodor.

Sale of a company owning a 4,326 kW hydropower plant with a prefectoral authorisation, located in Savoie. The plant has a head of around 852 m and a diverted flow of 0.525 m3/s. Average annual output of 14.43 GWh for average revenue of close to €1,080k. EDF H07 contract. This plant was part of Project Canodor.

Sale of a 10 MW hydropower plant, operated under a concession, located in the Hautes-Alpes. The plant has a head of 119.6 m and a diverted flow of 12.28 m3/s. Average annual output of 35.92 GWh for average revenue of €2,406k. EDF H07 and H01 contracts. This plant was part of Project Canodor.

Sale of a 400 kW hydropower plant, operated under a concession, located in the Hautes-Alpes. The plant has a head of around 74 m and a diverted flow of 1.85 m3/s. Average annual output of 3.5 GWh for average projected revenue of €395k under an EDF H07 contract. This plant was part of Project Canodor.

Sale of a 4,450 kW hydropower plant, operated under a concession, located in the Hautes-Alpes. The plant has a head of around 74 m and a diverted flow of 6.15 m3/s. Average annual output of 14.5 GWh for average projected revenue of close to €1,099k under an EDF H07 contract. This plant was part of Project Canodor.

Sale of a 3,200 kW hydropower plant, operated under a concession, located in the Hautes-Alpes. The plant has a head of around 39.75 m and a diverted flow of 12 m3/s. Average annual output of 14 GWh for average projected revenue of €934k under EDF H01 and H07 contracts. This plant was part of Project Canodor.

Sale of a 2,500 kW hydropower plant, operated under a concession, located in the Isère. The plant has a head of around 583 m and a diverted flow of 0.4 m3/s. Average annual output of 12.59 GWh for average revenue of close to €1,048k on the open market. This plant was part of Project Canodor.

Sale of a 3,500 kW hydropower plant, operated under a concession, located in the Isère. The plant has a head of around 523 m and a diverted flow of 0.75 m3/s. Average annual output of 21.27 GWh for average revenue of close to €1,618k on the open market. This plant was part of Project Canodor.

Sale of four hydropower plants (concession and authorisation) totalling 28,000 kW, located in the Isère. Average annual output of 125 GWh for average revenue of close to €8,137k on the open market. These plants were part of Project Canodor.

Project Canodor in a nutshell: - Sale of a package of 19 plants with 70 MW in operation and more than 10 MW to be built - The oldest high-head hydropower plant in the world - 315 GWh/year - €22M annual revenue - Concessions and authorisations - Rhône-Alpes region

Sale of a high-head plant with a storage reservoir and 4 tunnels, located in the Corrèze. Concession for a PMB of 10,200 kW. The plant has a head of over 150 m. Average annual output is 29 GWh for average revenue of around €1.87M. Access reserved for buyers shortlisted for the second round.

Sale of 100% of the shares in a company owning a 450 kW hydropower plant located in the Jura. Average annual output is 1,627,000 kWh for average revenue of around €185k. Prefectoral authorisation for a PMB of 594 kW. The plant has a head of 8.90 m for a diverted flow of 6.8 m3/s. EDF H07 purchase obligation contract, commissioned at the end of 2012. Freehold.

Sale of a package of 7 hydropower plants with a total capacity of around 7 MW. Average annual output is 25 GWh for total average revenue of €2M. Départements: Hautes-Pyrénées, Lot-et-Garonne, Haute-Garonne, Aude. Access reserved for buyers shortlisted for the second round.

Sale of a 400 kW hydropower plant located in the Aude. Grandfathered water rights (fondé en titre) for a PMB of 570 kW. The plant has a head of 4.8 m and a diverted flow of 12.1 m3/s. Average annual output of 2.1 GWh for average revenue of €229k under an EDF H07 contract. Compliance works will need to be carried out; a new CODOA has already been obtained and will allow the buyer to start a new 20-year H07 contract. Asset sale. Freehold.

Sale of 100% of the shares in a company owning a 380 kW hydropower plant located in the Haute-Vienne. Prefectoral authorisation until 2037 for 600 kW. Head of 8.73 m for an authorised flow of 7 m3/s. Average annual output of 0.9 GWh for average annual revenue of €111k under an EDF H07 contract. All the mandatory investment has been made. Potential to increase annual output - works application currently under review. Freehold.

Sale of a 400 kW hydropower plant topped by a 35 kWp photovoltaic plant, located in the Aude. Head of 4.4 m for a flow of 11.4 m3/s. Total average annual output of 2.3 GWh for average revenue of €250k. EDF H07 contract. Prefectoral authorisation for a PMB of 496 kW currently being renewed. Asset sale. Freehold.

Sale of 2 companies owning 3 hydropower plants located in the Pyrénées-Atlantiques, with a total capacity of 2 MW. The plants hold prefectoral authorisations or grandfathered water rights (fondé en titre). Average annual output of 12 GWh for total average revenue above €1.1M. H07 contracts with the full investment already made. All 3 installations have been brought into environmental compliance. Freehold.

Sale of a hydropower plant located in the Aveyron with a capacity of 220 kW. The plant has a prefectoral authorisation, a head of 3 m and a diverted flow of 11.3 m3/s. Average annual output is 795 MWh for average annual revenue of €95k under an EDF H07 contract.

Sale of 100% of the shares in a company owning a 170 kW hydropower plant located in the Ariège. Average annual output is 530,165 kWh for average revenue of €54,581/year. The plant has a prefectoral authorisation renewed in 2008 for 30 years and an EDF H07 contract until 2032. Medium head with penstock. Site held freehold.

Sale of a package of 2 cascade hydropower plants located in the Haut-Rhin, with a total capacity of 705 kW. Diverted flow of 6 m3/s for a gross head of around 7 m at each plant. Prefectoral authorisations expiring in 2039. Total average annual output of 2 GWh for total revenue of €240k under EDF H07 contracts. Sale of 100% of the shares. Access to this listing will open from 6 March 2017.

Sale of 2 plants with capacities of 1 MW and 300 kW. Total average annual output of 3 GWh for average revenue of €300k. EDF H07 contracts until 2033, sites held freehold, poor overall condition. Major works to be carried out on both plants within a very short timeframe. Very complex regulatory situation with the DDT, with environmental compliance works required urgently (upstream and downstream fish passage). Access reserved solely for producers contacted directly. If you are seriously interested, please contact us directly.

Sale of 100% of the shares in a company owning a 1.1 MW hydropower plant located in Haute-Savoie. Prefectoral authorisation until 2022 for 1,586 kW. Head of 16 m for an authorised flow of 10 m3/s. Average annual output of 4.9 GWh for average annual revenue of €409k under an EDF H07 contract. All the mandatory investment has been made. Freehold.

Sale of a 210 kW hydropower plant located in the Dordogne. Head of 1.30 m for an authorised flow of 15 m3/s. Prefectoral authorisation until 2054 for a capacity of 250 kW. It has an EDF H07 contract until October 2032. Average annual output of 411,363 kWh for average revenue of €48,985. Asset sale.

Sale of a hydropower plant located in the Haute-Loire with a capacity of 220 kW. The plant has a prefectoral authorisation, a gross head of 12 m and a diverted flow of 3.5 m3/s. Average annual output is 0.7 GWh for average annual revenue of €92k.

Sale of a 400 kW hydropower plant located in the Ariège. Prefectoral authorisation until 2028 for a head of 4.25 m and a flow of 12 m3/s. The plant has an EDF H07 purchase obligation contract until 2032. Freehold. Average annual output of 1.5 GWh for average revenue of €152k. Share sale. Please note that access requests for this listing will be validated from Monday 25 May 2015.

Sale of a hydropower plant authorised for 615 kW (PMB) located in Haute-Savoie. Head of 33 m for an authorised flow of 1.9 m3/s. Average annual output of 1.5 GWh for average projected revenue under an H16 contract of around €177k. The plant is currently shut down and requires a complete renovation, estimated at around €1M, before it can be recommissioned. Asset sale. The buyer must already own one or more hydropower plants for the authorisations to be transferred to it.

Sale of a hydropower plant located in the Aveyron with a prefectoral authorisation for a capacity of 1.9 MW. The plant has 3 turbines under a 2.46 m head on the Lot. Average annual output is 3 GWh for average projected revenue of €218k with partial renovation. Site held freehold. Sale of 100% of the company's shares.

Sale of a company holding all the rights required to build a plant with a VLH turbine of 400 kW gross capacity. Located on the Corrèze, with a head of 2.4 m, for projected revenue under an EDF H07 contract of €150k. Land held freehold; works of around €1M to be carried out, with commissioning scheduled for late 2017.

This hydropower plant, located in the Tarn-et-Garonne, holds a prefectoral authorisation until 2044 for 681 kW, of which 357 kW is grandfathered (fondé en titre). The existing plant has a 93 kW unit installed under a 2.56 m head. Current average output of 519,146 kWh for average annual revenue of €55,893. The new authorisation obtained in 2014 allows the plant's capacity to be increased by diverting a flow of 27.1 m3/s. EDF H07 contract. Freehold, including the plots anchoring the dam. Sale of 100% of the shares.

Sale of a hydropower plant in the Lot-et-Garonne with grandfathered water rights (fondé en titre) for a capacity of 92.6 kW. A study to increase the plant's capacity to a PMB of 217 kW has been carried out. Projected annual output (if the capacity increase project goes ahead) is between 550 and 660 MWh per year, for annual revenue of €56k to €67k. Site held freehold. Asset sale.

This medium-head plant, located in the Ardèche, holds a prefectoral authorisation for 1 MW. Current average output is 1.9 GWh for average open-market revenue of €109k. A CODOA (purchase obligation certificate) has been obtained for 460 kW and would raise revenue to over €210k. Sale of 100% of the shares. Freehold.

Sale of a hydropower plant in the Vosges. Prefectoral authorisation until 2042 for a capacity of 210 kW. Head of 4.3 m for an authorised flow of 5 m3/s. It has an EDF H07 contract until 2032. Average annual output is 1.2 GWh for average revenue of €130k.

Sale of 100% of the shares in a company owning a 500 kW hydropower plant. The plant benefits from grandfathered water rights (fondé en titre) and a prefectoral authorisation for a total PMB of 792 kW. A Francis turbine is installed under a head of around 5 m. Diverted flow of 15 m3/s. Average annual output of 3.7 GWh for average revenue of €331k. EDF H07 contract. Freehold. River Garonne

Puy de Dôme: Hydropower plant with grandfathered water rights (fondé en titre) for 135 kW. Authorised flow of 1.9 m3/s for a gross head of around 7 m. Average annual output of 300,000 kWh for average revenue of €37k excl. VAT. EDF H07 contract. Asset sale. Freehold.

Sale of a 160 kW hydropower plant located in the Mayenne. Prefectoral authorisation until 2045 for 350 kW. Head of 2.19 m for a flow of 16.3 m3/s. EDF H07 contract until 2031. Average annual output of 840,000 kWh for average revenue of €86k excl. VAT. Asset or share sale (at the buyer's choice). Potential to increase the plant's capacity to 250 kW.

Sale of a 200 kW hydropower plant located in the Jura. The installation has a 27 m head and a flow of 3.25 m3/s. Average annual output of 1.7 GWh for average revenue of €125k on the open market.

This hydropower plant holds a prefectoral authorisation until 2023 for 280 kW. It has one generating unit installed under a head of around 18 m for a flow of 1.6 m3/s. Current power purchase contract: EDF H03. Average annual output above 495 MWh for average projected revenue of €55k excl. VAT under an EDF H07 contract. Asset sale. Land tenure secured.

The site for sale is a former paper mill that had 2 micro-hydro plants on the same weir (right and left banks). Authorised as early as 1907, the gross head was 3.24 m in 1922 and is around 2.7 m today. The flap-gate weir is in reasonable condition, as is the fish pass, but both plants are in very poor condition and need a complete renovation. The river's mean flow is around 15 m3/s. The water rights need to be renewed. The sale includes all the buildings of the former paper mill, closed in 2006, on a 1.4-hectare plot. Asset sale, fixed price.
Our teams value your asset and run the competitive process across our network of more than 1,400 investors.