Track record

Sale of a 495 kW hydropower plant located in Creuse. The plant holds a prefectoral authorisation, with a head of 10 m and a diverted flow of 6.6 m3/s. Average annual output is 1.3 GWh. Average revenue under the H07 contract is 135 k€. Freehold ownership.

Sale of a company owning a 291 kW hydropower plant located in Morbihan. The plant holds an authorisation for a maximum gross capacity (PMB) of 405 kW, with a head of 2.3 m and an authorised diverted flow of 18.1 m3/s. Average annual output is 0.9 GWh/year, for average revenue of 112 k€/year under an EDF H07 contract.

Sale of a 420 kW hydropower plant located in Lot. The plant holds a prefectoral authorisation for 790 kW based on grandfathered water rights (fondé en titre), with a diverted flow of 35 m3/s. Average annual output is around 0.9 GWh/year, for average revenue of around 90 k€/year under an EDF H07 contract. Freehold ownership. Asset sale.

Estimate as part of the valuation of a hydropower plant located in Yonne.

Strategic advisory
Operating asset portfolios — Multi-year revaluation mandate for a portfolio of operating wind and hydropower assets on behalf of an independent power producer.

Sale of a 1.2 MW hydropower plant located in Vienne. The plant holds a prefectoral authorisation, with a head of 2.6 m and a diverted flow of 53 m3/s. Average output is 3 GWh/year, for average revenue of around 290 k€/year under an H07 contract. Potential to increase annual output. Freehold ownership.

Sale of a company owning a high-head hydropower plant located in Cantal. The plant has a head of 156 m, a diverted flow of 300 l/s and a maximum gross capacity of 470k W. The EDF H07 contract has just been terminated and a new power sale agreement on the open market has been signed. Average revenue under the H07 contract was 155 k€.

Sale of a company owning a 386 kW hydropower plant located in Hautes Pyrénées. The plant holds a prefectoral authorisation and has a head of 60 m. Average annual output is 2.3 GWh, for average revenue of 224 k€ under an EDF H07 contract.

Sale of a 445 kW hydropower plant located in Ain. The plant holds a prefectoral authorisation, with a head of 10 m and a diverted flow of 4.5 m3/s. Average annual output is 0.9 GWh. The EDF H07 contract has just been terminated and a new power sale agreement on the open market has been signed. Average revenue under the H07 contract was 114 k€.

Sale of a company owning 1 hydropower plant of 1 MW located in Ariège. The plant holds a prefectoral authorisation for a maximum gross capacity (PMB) of 2.5 MW, with a head of 4 m and a diverted flow of 64 m3/s. Average annual output is 6.5 GWh/year, for average revenue of 800 k€/year under an EDF H16 CR contract. Freehold ownership

Sale of a batch of 4 low-head hydropower plants with a total maximum gross capacity of 10.5 MW. The plants are located in Meurthe-et-Moselle. Total average output is 25 GWh/year, for average revenue of 2.4 M€ under EDF HR97, H03 and H07 contracts. The 4 plants are held by 1 company.

Sale of a hydropower project to be developed and built, with a capacity of 212 kW, in Chartreuse. The planned plant does not yet have a prefectoral authorisation; the gross head is 65 m for a mean flow of 277 l/s. Average output will be around 495 MWh/year, for average revenue of around 63 k€/year under an EDF H16CR contract. Freehold ownership.

Sale of a company owning a 548 kW hydropower plant located in Allier. The plant has a head of 4.7 m and a diverted flow of 17 m3/s under an authorisable concession. Average annual output is 1.57 GWh/year, for average revenue of 167 k€ under an EDF H07 contract. Freehold ownership.

Sale of a company owning a 180 kW hydropower plant located in the Doubs. The plant benefits from grandfathered water rights (fondé en titre) for a maximum gross capacity (PMB) of 225 kW, with a head of 1.8 m and an authorised diverted flow of 12.9 m3/s. Average annual output is 0.8 GWh/year for average revenue of 90 k€/year under an EDF H07 contract. Freehold ownership and easements.

Buy-side advisory for the acquisition of a company owning a 548 kW hydropower plant located in the Allier. The plant benefits from an authorisable concession and a head of 4.70 m. Average annual output is 1.8 GWh for average revenue of 190 k€ under an EDF H07 contract.

Sale of 2 low-head hydropower plants with a total maximum gross capacity of 5.6 MW. Calculated annual output is approximately 22 GWh/year, for revenue under an EDF H07 contract of close to 1.9 M€. Water rights held under prefectoral authorisation, with a remaining term of more than 50 years. The 2 plants are held by 2 companies. Buyers may submit an offer for one or more companies.

Sale of a company owning a 130 kW hydropower plant located in the Mayenne. The plant benefits from grandfathered water rights (fondé en titre) for a maximum gross capacity (PMB) of 130 kW, with a head of 1.61 m and an authorised diverted flow of 8.3 m3/s. Average annual output is 0.45 GWh for average revenue of 45 k€/year under an EDF H07 contract. Freehold ownership.

Sale of a package of 2 low-head hydropower plants held by 1 company and located in the Charente. Each plant holds a prefectoral authorisation based on grandfathered water rights (fondé en titre), for a combined maximum gross capacity (PMB) of 810 kW. Average annual output is 1.5 GWh/year for total average revenue of 190 k€/year under EDF H07 contracts. Freehold ownership

Sale of a company owning a 400 kW hydropower plant located in the Dordogne. The plant holds a prefectoral authorisation based on grandfathered water rights (fondé en titre) of 87 kW, for a maximum gross capacity (PMB) of 498 kW and a diverted flow of 19 m3/s. The plant was commissioned in June 2019 and benefits from an EDF H16 OA contract. Forecast annual output is 1.4 GWh/year for forecast average revenue of 210 k€/year. Freehold ownership.

Sale of a company owning a 300 kW hydropower plant located in the Aude. The plant holds a prefectoral authorisation for a maximum gross capacity (PMB) of 483 kW, with a head of 3.5 m and an authorised diverted flow of 14 m3/s. Average annual output is 0.95 GWh/year for average revenue of 110 k€/year under an EDF H07 contract. Freehold ownership.

Sale of a decommissioned high-head hydropower plant, built in 1926 to electrify a village. Authorised for a gross capacity of 511 kW, it has a head of 208 m for a diverted flow of 250 l/s. Forecast average annual output is 1.31 GWh/year for forecast average revenue of 216 k€/year under an EDF H16 OA contract, subject to the investment being made. Asset sale including, in particular, the land held freehold (headrace canal, penstock and powerhouse). Access will only be granted to buyers who already have the technical capabilities (evidenced by owning and operating a hydropower plant) and financial capabilities (proof of equity of at least 400 k€).

Sale of 6 hydropower plants — Sale of a package of 6 low-head hydropower plants with a total maximum gross capacity of 35 MW. The plants are located in the Lot, the Lot-et-Garonne, the Tarn-et-Garonne and the Haute-Garonne. Total average output is 78 GWh/year for average revenue of 8 M€/year under EDF H07 contracts and on the open market. The plants hold prefectoral authorisations with temporary occupation permits (AOT), one concession and 2 expired concessions.

Sale of a company owning a hydropower plant with a gross capacity of 485 kW. The plant holds a prefectoral authorisation until 2038 and has a gross head of 1.97 m. Land held freehold.

Sale of 2 companies each owning a hydropower plant, with a total capacity of 772 kW, located in the Ardèche. Each plant holds a prefectoral authorisation, for a combined maximum gross capacity (PMB) of 901 kW. Total output is approximately 2 GWh/year for average revenue of 253 k€/year under EDF H07 contracts for 19 years. Freehold ownership and long-term (emphyteutic) lease.

Sale of a company owning a 900 kW hydropower plant, with a lake serving as a water reserve for peak-time generation, located in the Lozère. The plant holds a prefectoral authorisation for a maximum gross capacity (PMB) of 960 kW, with a head of 82 m and an authorised diverted flow of 1.2 m3/s. Average annual output is 1.76 GWh/year for average revenue of 240 k€/year under an EDF H07 contract and on the open market. Freehold ownership.

Sale of a company owning a high-head (144 m) hydropower plant located in the Aude. The plant has a diverted flow set at 350 l/s and a maximum gross capacity of 495 kW. Average annual output is 1.6 GWh for average revenue of 160 k€ under EDF H07 contracts.

Sale of a company owning 2 ready-to-build low-head hydropower projects located in the Gard, 2 km apart. The projects hold a prefectoral authorisation for a total maximum gross capacity (PMB) of 1.3 MW and a diverted flow of 23 m3/s. Forecast annual output is estimated at 3.2 GWh/year for total forecast revenue of 533 k€ under EDF H16 OA contracts.

Sale of a company owning a 400 kW hydropower plant located in the Vaucluse. The plant benefits from grandfathered water rights (fondé en titre), with a head of 2.5 m and an authorised diverted flow of 18 m3/s. Average annual output is 1.6 GWh/year for average revenue of 185 k€/year under an EDF H07 contract. Freehold ownership.

Sale of a company owning a hydropower project to be built, located in the Tarn. The project holds a prefectoral authorisation with a maximum gross capacity (PMB) of 323 kW. The diverted flow is set at 10 m3/s and the head is 3.29 m. Forecast average annual output is 0.75 GWh/year for forecast average revenue of 115 k€/year under an EDF H16 contract. Long-term (emphyteutic) lease agreement.

Sale of a 265 kW hydropower plant located in the Cantal. The plant benefits from grandfathered water rights (fondé en titre) for a maximum gross capacity (PMB) of 283 kW, with a head of 5.8 m and an authorised diverted flow of 5 m3/s. Average annual output is 830 MWh/year for average revenue of 105 k€/year under an EDF H07 contract. Freehold ownership. Asset sale.

Sale of a 400 kW hydropower plant topped by a 35 kWp photovoltaic plant, located in the Aude. The hydropower plant holds a prefectoral authorisation for a maximum gross capacity (PMB) of 496 kW, with a gross head of 4.44 m and a diverted flow of 11.4 m3/s. Average annual output is 2 GWh for revenue of 228 k€ under an EDF H07 contract. The photovoltaic plant produces 39 MWh a year on average for average revenue of 20 k€ under an S10 contract. Freehold ownership.

Valuation of a hydropower plant located in the Côte d'Or in connection with an estate settlement.

Sale of a hydropower plant on behalf of the State, with a maximum gross capacity (PMB) of 960 kW, located in the Aude. Authorisable concession granted in 1975, commissioned in 1981, water right expired in 2011. The sale includes 2.3 hectares of land as well as the fixed installations (dam, penstock and turbine). Average output of 1.2 GWh/year for a head of 91 m and a diverted flow of 1.1 m3/s. Technical and financial capabilities for operating a hydropower plant are required.

Sale of a package of 2 low-head hydropower plants located in the Haute-Garonne, approximately 250 m apart. Each plant holds a prefectoral authorisation, for a combined maximum gross capacity (PMB) of 2.9 MW. Average annual output of 8.8 GWh for total average revenue of 743 k€ under an EDF H07 contract. Freehold ownership.

Sale of a company owning a 900 kW hydropower plant located in the Ardèche. The plant holds a prefectoral authorisation, currently being renewed, for a maximum gross capacity (PMB) of 1.2 MW, with a head of 14 m and a diverted flow of 8.4 m3/s. Average historical output of 2.3 GWh for average revenue of 214 k€ under an EDF H07 contract. The site has the potential to increase annual output to 3.1 GWh, i.e. forecast revenue of 360 k€ under an EDF H16 contract. Freehold ownership.

Sale of a package of 6 low-, medium- and high-head hydropower plants with a total maximum gross capacity of 6.7 MW. The plants are located in Savoie, the Alpes-de-Haute-Provence, the Tarn and the Pyrénées-Atlantiques. Total average output is 16 GWh/year for average revenue of 1.6 M€ under EDF H07 and H16 CR contracts. The 6 plants are held by 5 companies. Buyers may submit an offer for one or more companies. Access restricted to buyers selected for the 2nd round.

Sale of a company owning a 400 kW hydropower plant located in the Haute-Loire. The plant holds a prefectoral authorisation for a maximum gross capacity (PMB) of 785 kW, with a head of 5 m and an authorised diverted flow of 16 m3/s. Average annual output is 1.2 GWh/year for average revenue of 145 k€/year under an EDF H07 contract. Forecast average annual output is 1.8 GWh/year for forecast average revenue of 280 k€/year under an EDF OA H16 contract. Freehold ownership.

Sale of a hydropower project located in the Corrèze comprising a water right of unlimited duration (pre-dating the 1919 Act) for 150 kW and a former mill with a dam and tailrace. The diverted flow is set at 9 m3/s for a head of 1.7 m. Forecast average annual output is 0.6 GWh for forecast average revenue of 90 to 100 k€ (depending on the technical solution chosen) under an EDF H16 OA contract. Freehold ownership.

Introduction to banks for the financing of the acquisition of a company owning a 500 kW hydropower plant.

Sale of a company owning a 400 kW hydropower plant located in the Sarthe. The plant holds a prefectoral authorisation based on grandfathered water rights (fondé en titre) of 147 kW, with a head of 2.3 m and a diverted flow of 21 m3/s. Estimated average annual output is 0.9 GWh/year for average revenue of 145 k€/year under an EDF OA H16 contract with a remaining term of 18 years.

Sale of a company owning a 441 kW hydropower plant located in the Dordogne. The plant benefits from grandfathered water rights (fondé en titre) of 790 kW, a head of 2.4 m and a diverted flow of 33 m3/s. Current average output is 2.4 GWh/year for revenue of 276 k€/year.

Sale of a company owning a 500 kW hydropower plant located in the Bouches-du-Rhône. The plant holds a prefectoral authorisation stating a maximum gross capacity (PMB) of 857 kW, with a head of 9.5 m and an authorised diverted flow of 9.2 m3/s. The plant was commissioned in 2020 and benefits from an EDF H16 OA contract. Forecast annual output is 2.25 GWh for forecast average revenue of 316 k€.

Sale of a company owning a 300 kW hydropower plant located in the Corrèze, commissioned in late 2019. The plant holds a prefectoral authorisation until 2046 and has a head of 2.2 m for a diverted flow of 20 m3/s. Forecast average annual output of 1 GWh for forecast average revenue of 135 k€ under an EDF OA H16 contract. Freehold ownership.

The Torrents de Savoie project involves the sale of 2 hydropower projects at different stages of development. SH Valloirette, which holds a ready-to-build project with a maximum gross capacity of 3.5 MW; SH Ambin, which is developing a project with a maximum gross capacity (PMB) of 4.4 MW

Sale of a hydropower plant holding a prefectoral authorisation for 1.8 MW. Head of 3.7m for annual revenue of 290 k€. Freehold ownership.

Sale of a 630 kW hydropower plant located in the Vosges. The plant holds a prefectoral authorisation with a maximum gross capacity (PMB) of 799 kW and a head of 48.5 m. Average historical output of 1.4 GWh, currently sold on the open market for average revenue of 65 k€. The 630 kW EDF H07 contract is suspended until compliance works have been completed. Forecast revenue under the EDF H07 contract is 109 k€. Freehold ownership. Asset sale.

Sale of a 185 kW hydropower plant located in the Calvados. The plant holds a prefectoral authorisation with a head of 2.5 m and a diverted flow of 7.5 m3/s. Average output is approximately 0.4 GWh/year for average revenue of approximately 53 k€/year under an EDF H07 contract. Freehold ownership.

Sale of a 116 kW hydropower plant located in the Lot. The plant benefits from grandfathered water rights (fondé en titre) with a maximum gross capacity (PMB) of 116 kW, a head of 2.95 m and a diverted flow of 4 m3/s. Forecast average annual output of 400 MWh for average revenue of approximately 42 k€ under an EDF H07 OA contract. Freehold ownership