
We are pleased to announce the launch of the disposal of two operating hydropower plants and one hydropower project to be built: - Corrèze: 1 plant of 300 kW and 1 project to be built with a water right of unlimited duration for 150 kW (references 903 and 904 on our webs
We are pleased to announce the launch of the disposal of two operating hydropower plants and one hydropower project to be built: